Over the years we have completed a lot of projects. Here is our work experience sorted by category. To find more information please choose from the tabs below. Also, you can download our Company Profile to get a more comprehensive look at our work experience.

 

References

Jim McConnell UDOT (435) 865-5556
Zane Pentz Sunrise Engineering (435) 743-1136
Frank Seegmiller Creamer & Noble (435) 673-4677
Reed Noble Creamer & Noble (435) 673-4677
Lance McIntosh Z & H Engineering (602) 997-7536

Completed Projects

Owner UDOT
Contact Lyndon Friant
Project Name I-15 Truck Climbing Lanes
Scope of Work Addition of truck climbing lane, both directions, for 10 miles of I-15.
Contract Amount $5,997,538
Completion Date October 2013
Owner UDOT
Contact Jim McConnell
Project Name Washington Interchange at MP 13
Scope of Work Construction of new interchange with overpass and related road const.
Contract Amount $6,367,341
Completion Date May 2004
Owner St. George City
Contact Aaron Baker
Project Name Dixie Drive Bridge
Scope of Work Construct bridge over Santa Clara River, and related road const.
Contract Amount $3,082,811
Completion Date June 2004
Owner Utah Department of Transportation
Contact Rex Friant
Project Name South St. George Interchange
Scope of Work Construct bridge over I-15 at Bluff Str, and related road const.
Contract Amount $2,225,000
Completion Date May 1995
Owner Arizona Department of Transportation
Contact Audra Merrick
Project Name Fredonia Paving – US89A
Scope of Work Mill and pave 1.1 miles of highway.
Contract Amount $473,105
Completion Date May 2002
Owner Utah Department of Transportation
Contact Randall Taylor
Project Name Rotomill and Seal SR89
Scope of Work Rotomill, tack, seal coat and chip 5 miles of SR89.
Contract Amount $443,998
Completion Date September 2005
Owner UDOT
Contact Jim McConnell
Project Name Virgin River Bridge Paving
Scope of Work Paving new bridge and related road paving on SR9.
Contract Amount $292,070
Completion Date November 2003
Owner ADOT
Contact
Project Name ADOT (I-15) Mesquite-Littlefield North Highway
Scope of Work Milling and paving I-15.
Contract Amount $1,835,528.38
Owner Cholla Ridge, LLC
Contact
Project Name Trail Ridge Bridge Structure
Scope of Work Bridge structure.
Contract Amount $847,806.67
Owner UDOT
Contact Jim McConnell
Project Name Washington Interchange at MP 13
Scope of Work Construction of new interchange with overpass and related road const.
Contract Amount $6,367,341.25
Owner UDOT
Contact Jim McConnell
Project Name Virgin River Bridge Paving
Scope of Work Paving new bridge and related road paving on SR9.
Contract Amount $292,070.00
Owner St. George City
Contact Aaron Baker
Project Name Dixie Drive Bridge
Scope of Work Construct bridge over Santa Clara River, and related road construction.
Contract Amount $3,082,811.50
Owner Utah Department of Transportation
Contact Rex Friant
Project Name South St. George Interchange
Scope of Work Construct bridge over I-15 at Bluff Str, and related road construction.
Contract Amount $2,225,000.00
Owner Arizona Department of Transportation
Contact Audra Merrick
Project Name Fredonia Paving – US89A
Scope of Work Mill and pave 1.1 miles of highway.
Contract Amount $473,105.00
Owner San Juan County / FAA
Contact Frank Seegmiller / Reed Noble
Project Name Cal Black Airport
Scope of Work 520,000 cubic yards of excavation, asphalt pavement, road base, utility and electrical to construct new airport runways and roads.
Contract Amount $2,700,000.00
Owner Utah Department of Transportation
Contact Randall Taylor
Project Name Rotomill and Seal SR89
Scope of Work Rotomill, tack, seal coat and chip 5 miles of SR89.
Contract Amount $443,998.00
Owner Page City / FAA
Contact Lance McIntosh
Project Name Page Municipal Airport Runway and Drainage Improvements
Scope of Work Construct alternate runway and extend and pave existing runway.
Contract Amount $1,593,574.00

References

Jerry Nelson PBS & J Engineering (702) 293-2992
Richard Marshall National Park Service (303) 969-2569
Ted Wolff ADOT (928) 774-1799
Jim McConnell UDOT (435) 865-5556
Leif Condie UDOT (435) 865-5500
Mike Shaw Washington City (435) 656-6300
Ron Thompson WCWCD (435) 673-3617

Completed Projects

Owner National Park Service
Contact Richard Marshall
Project Name Willow Beach , Redevelop Visitor Facilities & Install Flood Protection
Scope of Work Build maintenance facilities, water treatment plant, restroom facilities, concession store and maintenance building. Installation of entire water and sewer systems.
Contract Amount $20,308,300
Completion Date May 2011
Owner National Park Service
Contact Richard Marshall
Project Name Lake Mead Water Treatment Plant, Lake Mead Callville Bay, Katherine Landing
Scope of Work Building two 250 GPM water treatment plants, one 300 GPM water treatment plant, each including water tanks and irrigation system.
Contract Amount $11,000,000
Completion Date January 2001
Owner UDOT
Contact Jim McConnell
Project Name Kannarraville Rest Areas
Scope of Work Demolish and reconstruct freeway entrances and exits, restroom buildings, including masonry work, HVAC, title work, plumbing, etc.
Contract Amount $4,500,000
Completion Date June 1999
Owner National Park Service
Contact Richard Marshall
Project Name Willow Beach Wastewater Facility
Scope of Work Bring wastewater treatment facility into compliance.
Contract Amount $3,028,095.00
Completion Date December 2006
Owner Washington City
Contact Mike Shaw
Project Name Washington City Membrane Filtration Plant
Scope of Work Construct Water Treatment PLant and concrete water tanks.
Contract Amount $1,387,566
Completion Date January 2004
Owner ADOT – TEA-037-3(14)P 1651 W Jackson, Room 121F, Phoenix, AZ 85000
Contact Ted Wolff
Project Name Bitter Springs Fredonia Rest Area
Scope of Work Build new rest area facility with parking, information and rest area buildings.
Contract Amount $994,791
Completion Date July 2001
Owner UDOT
Contact Leif Condie
Project Name Zion National Park, Springdale Intermodal & Shuttle Stops
Scope of Work New construction of 8 shuttle stops, road widening, decorative masonry work. Work done at entrance to Zion National Park.
Contract Amount $770,000
Completion Date June 2001
Owner Washington City
Contact Mike Shaw
Project Name Sienna Hills Sewer Lift Station
Scope of Work Construct Sewer Lift Station.
Contract Amount $514,748
Owner Washington County Water Conservancy District
Contact Ron Thompson
Project Name Pah Tempe Pump Back Station
Scope of Work Construct building and install pumps and generators servicing 96” pipe.
Contract Amount $408,627
Completion Date December 2010
Subdivision Projects: Building lots, water, sewer, irrigation, power, curb & gutter, sidewalk, etc. partial listing
Grandpa’s Pond Park $1,601,877
Trail Ridge/Whispering Pines $2,719,705.55
Indigo Ridge $3,743,239,34
Zion View Estates $717,011
Coronado Ridge $693,683
Pecan Meadow Subdivision $480,000
Sky Mountain Subdivision $204,000
Canyon Ridge $735,000
Sky Ranch $397,000
Harrisburg $415,000
Saddleback $344,000
South Pointe $422,000
Cholla Creek $531,000
Sunbrook $865,000
Clearing of Land and Dams
WCWCD – South Creek Dam $1,100,000 Construct Dam
Washington Fields Diversion Dam $853,207 Construct Dam
Quail Lake South Dam Basin Lining $800,000 Site Work
Coral Cliffs Cinema $500,000 Site Work
SITLA, Sienna Hill $2,129,411 Site Work
Hurricane Professional Plaza $589,930 Site Work
Purgatory $208,000 Site Work
Smead $684,000 Site Work
Washington County Landfill $987,000 Site Work
Red Cliffs Mall $350,000 Site Work
Washington Fields Diversion Dam $1,000,000 Construct Dam
Virgin Diversion Dam $150,000 Construct Dam
Other contracts of special note
Boat Ramps for National Park Serv. $2,302,862 Boat Ramps
Navajo Lake-Dixie Nat’l Forest $333,500 Water System
Whiteriver Wastewater $4,401,000 Sewer System
SITLA, Sienna Hill $2,129,411 Site Work
Washington Fields Road $506,000 Road Construction
Springdale Sewer $311,000 Sewer Lagoons
Moapa Water System $1,084,000 Water Line
Panaca Water Main Replacement $816,972 Water Line
East St. George Interchange $2,775,000 Bridge and Road
Colorado City Airport $850,000 Airport
Cedar City 200 North $3,500,000 City Street Construction
Panguitch Main Street $1,845,000 City Street Construction
Valley of Fire $1,044,000 Road Construction
Kershaw Ryan State Park $1,018,000 Road Construction
Escalante Main Street $800,845 City Street Construction
Santa Clara Drive $1,396,000 City Street Construction
Johns Valley Road $1,714,000 Road Construction

References

Jim McConnell UDOT (435) 865-5556
Jerrold Walters FHWA (303) 969-5958
Brent Gardner Alpha Engineering (435) 628-6500
Zane Pentz Sunrise Engineering (435) 743-6151
Paul Dastrup US Forest Service (435) 865-5556
Astrid Potter ADOT (928) 714-2225
Lance MacIntosh Z & H Engineering (602) 997-7536
Leif Condie UDOT (435) 865-5500
Kyle Paisley/Aaron Langston SITLA (435) 652-2950
Author LeBaron Hurricane City (435) 635-2811
Jay Sandberg St. George City (435) 634-5800

Completed Projects

Owner UDOT
Contact Leif Condie
Project Name SR-9 300 W to 800 N, Hurricane UT
Scope of Work Reconstruction and widening of SR-9.
Contract Amount $10,203,871.40
Owner Hurricane City
Contact Author LeBaron
Project Name 400 South; 300 W to 100 E
Scope of Work Reconstruction of roadway; including complete replacement of water and sewer systems as well as curb & gutter and sidewalk.
Contract Amount $1,357,868
Completion Date March 2017
Owner UDOT
Contact Ray Bentley
Project Name SR9; LaVerkin
Scope of Work Roadway reconstruction and widening with storm drain replacement for 5 miles of SR-9.
Contract Amount $2,508,877
Completion Date October 2015
Owner UDOT
Contact Tyler Turner
Project Name 600 North, Phase 2
Scope of Work Realignment and reconstruction of 3 miles of 600 North.
Contract Amount $2,4242,268
Completion Date July 2015
Owner UDOT
Contact Leif Condie
Project Name Kanab to Kanab Creek Bridge
Scope of Work Cut back existing rock slopes for new roadway contruction and reconstruction and widening of 10 miles of US-89.
Contract Amount $7,768,114
Completion Date October 2013
Owner St. George City
Contact Jay Sandberg
Project Name Red Hills Realignment & Drainage
Scope of Work Created box culvert for 650’ on existing wash.
Contract Amount $1,024,824
Completion Date October 2016
Owner Federal Highway Administration
Contact Jerrold Walters
Project Name Fredonia / Grand Canyon (2 projects)
Scope of Work Reconstruction of 11 miles of roadway near Jacobs Lake.
Contract Amount $13,262,000
Completion Date August 1996
Owner UDOT
Contact Leif Condie
Project Name SR9; 300 W to 800 N, Hurricane, UT
Scope of Work 1.6 miles of main street, SR9, reconstruction including culinary water system, sanitary sewer system, storm drain system, sidewalk, curb & gutter, landscaping and paving.
Contract Amount $10,203,871
Completion Date June 2011
Owner Utah Department of Transportation
Contact Jim McConnell
Project Name SR9, Flora Tec Road to 700 West
Scope of Work Construct 4.169 miles of highway, storm drain, water and sewer lines, traffic signals, fencing, etc.
Contract Amount $7,373,000
Completion Date May 1998
Owner SITLA
Contact Kyle Paisley or Aaron Langston
Project Name SITLA; grading and paving for Sienna Hills, various locations
Scope of Work Grapevine Crossing Rd, Red Stone Rd, Ridgeview Dr, City Park, Streetscapes & Roundabout (3 projects).
Contract Amount $6,305,526
Completion Date May 2010
Owner FHWA
Contact Dave Balding
Project Name Callville Bay Road
Scope of Work Construction of Callville Bay Road, Lake Mead
Contract Amount $5,332,000
Completion Date September 2004
Owner FHWA
Contact Scott Wolfert
Project Name Zion Canyon Scenic Drive
Scope of Work Road Improvements and reconditioning in National Park
Contract Amount $3,411,976
Completion Date August 2006
Owner Utah Department of Transportation
Contact Zane Pentz
Project Name Telegraph Road, Phase II
Scope of Work Roadway grading, drainage and paving for 3 miles of city street.
Contract Amount $2,900,000
Completion Date October 2011
Owner Page City
Contact Paul Dastrup
Project Name Lake Powell Blvd Reconstruction
Scope of Work Reconstruction of Main Street with asphalt, road base, sidewalk, curb & gutter, etc.
Contract Amount $2,315,510
Completion Date June 2002
Owner ADOT – 015-A-NFA / 015MO013H756601C 3770 E. Huntington Dr., Flagstaff, AZ 86004
Contact Astrid Potter
Project Name Mesquite – Littlefield North Highway Paving
Scope of Work Milling and Paving on I-15.
Contract Amount $1,835,528
Completion Date October 2009
Owner Washington City
Contact Astrid Potter
Project Name Washington Parkway
Scope of Work Construction of Washington Parkway.
Contract Amount $2,655,373
Completion Date September 2005
Owner U.S. Forest Service
Contact Paul Dastrup
Project Name Red Canyon Bike Trail
Scope of Work Construction of 12 miles of bicycle and pedestrian trail.
Contract Amount $1,425,256
Completion Date August 2002
Owner UDOT
Contact Jim McConnell
Project Name Highland Drive: 1000 East to City Limits
Scope of Work Reconstruct Highland Drive.
Contract Amount $1,037,550
Completion Date October 2003
Owner ADOT-IM-15-1(47)/14482401C
3770 E Huntington Dr., Flagstaff, AZ 86004
Contact Audra Merrick
Project Name Fredonia Paving
Scope of Work Milling and surfacing of 1.1 miles of state road.
Contract Amount $983,643
Completion Date May 2002
Owner UDOT
Contact Leif Condie
Project Name SR-212 Telegraph Rd, Washington UT
Scope of Work Reconstruction and widening of SR-212.
Contract Amount $5,515,139.50
Owner Beaver to Junction
Contact Dennis Ramsey
Project Name Federal Highway Administration Cenetral Federal Land Hwy Div
Scope of Work Reconstruct roadway.
Contract Amount $9,694,929.00
Owner FHWA
Contact Scott Wolfert
Project Name Zion Canyon Scenic Drive
Scope of Work Road Improvements and reconditioning in National Park.
Contract Amount $3,411,976.00
Owner FHWA
Contact Dave Balding
Project Name Callville Bay Road
Scope of Work Construction of Callville Bay Road, Lake Mead.
Contract Amount $5,332,000.00
Owner Utah Department of Transportation
Contact Jim McConnell
Project Name SR9, Flora Tec Road to 700 West
Scope of Work Construct 4.169 miles of highway, storm drain, water and sewer lines, traffic signals, fencing, etc.
Contract Amount $7,373,000.00
Owner Federal Highway Administration
Contact Jerrold Walters
Project Name Fredonia / Grand Canyon (2 projects)
Scope of Work Reconstruction of 11 miles of roadway near Jacobs Lake.
Contract Amount $13,262,000.00
Owner Utah Department of Transportation
Contact Zane Pentz
Project Name Telegraph Road, Phase II
Scope of Work Roadway grading, drainage and paving for 3 miles of city street.
Contract Amount $2,900,000.00
Owner U.S. Forest Service
Contact Paul Dastrup
Project Name Red Canyon Bike Trail
Scope of Work Construction of 12 miles of bicycle and pedestrian trail.
Contract Amount $1,425,256.00



References

Ron Thompson WCWCD (435) 673-3617
Larry Bulloch St. George City (435) 634-5800
Richard Marshall National Park Service (303) 969-2569
Michael Shaw Washington City (435) 634-9850
Phillip Leslie Leslie & Associates (435) 586-9474
Rick Wixom Springdale Town (435) 772-3434
Fred Ladman Page City (928) 645-4310
Jay Sandberg St. George City (435) 634-5800

Completed Projects

Owner St. George City
Contact Jay Sandberg
Project Name Washington Trail and Drainage
Scope of Work Box culvert and drainage reconstruction.
Contract Amount $2,427,356
Completion Date February 2016
Owner Washington City
Contact Mike Shaw
Project Name East Regional Culinary Water Connection
Scope of Work Installation of 3 miles new 20” high pressure transmission line and installation of pump house with 3 booster pumps.
Contract Amount $3,263,540
Completion Date November 2015
Owner National Park Service
Contact Richard Marshall
Project Name Lake Mead Rehab Water Dist. & Wastewater Collections
Scope of Work Construct water distribution & wastewater collection system for 8 developed bays and marinas.
Contract Amount $17,774,018
Completion Date February 2011
Owner UDOT
Contact Jim McConnell
Project Name I-15 to Iron Springs
Scope of Work Grading, drainage, and surfacing (water & sewer).
Contract Amount $5,892,384
Completion Date March 2005
Owner Sand Hollow Resort
Contact Tom Seneca
Project Name Sand Hollow Resort Water Pipeline
Scope of Work Installation 46,950 linear feet of 8”, 10”, 14”, and 20” HDPE pipeline. Two Pump stations and two water tanks.
Contract Amount $4,972,616
Completion Date November 2007
Owner Washington City
Contact Mike Shaw
Project Name Washington City Water Imp. Telegraph North, Phases I & II
Scope of Work Replace existing culinary water system and resurface and reconstruct all existing roadways.
Contract Amount $3,883,568
Completion Date January 2008
Owner City of St. George
Contact Larry Bulloch
Project Name Bloomington Outfall Sewer Line, St. George Tributary Sewer Line
Scope of Work Installation of 6 miles of 48″ concrete sewer transmission line, installation of 3200 feet of sewer pipe, repaving streets, repairs, etc.
Contract Amount $3,518,000
Completion Date March 1995
Owner WCWCD
Contact Ron Thompson
Project Name Crystal Creek to Kolob Reservoir Pipeline
Scope of Work Inlet diversion structure with 120,000 linear feet of 36” HDPE and mortar lined pipe.
Contract Amount $2,300,000
Completion Date July 2010
Owner Page City
Contact Fred Ladman
Project Name Elm Street Water System
Scope of Work Replace existing culinary water system and resurface and reconstruction of all roadways.
Contract Amount $1,626,572
Completion Date July 2009
Owner Washington County Water Conservancy District
Contact Ron Thompson
Project Name Quail Lake to Ivins Regional Pipeline
Scope of Work Installation of iron and steel pipe.
Contract Amount $1,461,950
Completion Date September 2004